Delivery content
500 m²

500 m²
Size
6 m
Clear height
2 months
Construction time
€355,000
From (0% VAT)
Basic info & design
Size500 m²
Clear height6 m
Architectural drawingsIncluded – permit drawings ready
Site supervisorIncluded
Operating areaAll of Finland
Earthworks
Earthworks for a level plot are included in the fixed price, when the plot's elevation difference is less than 1 metre
Drainage
Stormwater system
Contaminated soil replacement (not included, priced separately)
Rock blasting (not included, priced separately)
Piling (not included, priced separately)
Foundations
Footings
Foundation wall element
Floor: 150 mm reinforced concrete slab
Roof structure
1
Steel roofing
2
Underlay
3
500 mm blown insulation
4
Vapor barrier
5
Plasterboard
Doors & windows
3
Automatic lift doors
4 × 5.5 m · Remote control · Walk-in door · Low threshold
1
Exterior door
1.0 × 2.1 m
4
Fixed window
0.8 × 2.0 m · Freely positioned
MEP systems
Main electrical panel
General lighting
Air-to-water heat pump + underfloor heating pipes (included free)
Frequently asked questions
Is the building permit included in the price?
Architectural drawings for the permit are included in the delivery. The building permit fee and all other authority matters and fees are the customer's responsibility, unless otherwise agreed.
Who is responsible for authority matters?
All authority matters – such as the building permit application, neighbor consultation, inspections and other official fees – are the customer's responsibility, unless otherwise agreed in writing.
Is a soil survey required?
Yes. The customer must arrange a soil survey before construction begins. The soil survey is a prerequisite for choosing the correct foundation method. Without it we cannot guarantee that earthworks are included in the package price – for example, the need for piling or rock blasting only becomes clear from the survey.
What does "level plot" mean?
Earthworks are included for a level plot with an elevation difference of less than 1 m. Rock blasting, piling or contaminated soil replacement are not included – these are priced separately if needed.
Can the size or shape of the hall be changed?
Yes. We also deliver custom sizes – get in touch and we'll design a solution that fits your needs.
Which areas do you build in?
We operate across all of Finland.
How long does construction take?
A 500 m² hall is completed in about 2 months. Construction time is calculated from when the permit is granted and the plot is ready with an elevation difference of less than 1 m.
Is MEP included in the price?
The main electrical panel and general lighting are included. The air-to-water heat pump and underfloor heating pipes are included free of charge. Other ventilation and water systems are priced separately as needed, according to the customer's wishes.
Is the price fixed?
The price is fixed for a level plot suitable for excavation. Any additional work (rock blasting, piling, contaminated soil) is priced separately before the contract is signed – no surprises.
Note: Price from €355,000 (0% VAT). The final price is confirmed in the quote based on the plot and location.

Customer's responsibility: All authority matters (building permit fee, inspections, official fees) as well as the soil survey are the customer's responsibility, unless otherwise agreed. The soil survey must be provided before the contract is signed.

Request a quote!

Get in touch – we also respond quickly via WhatsApp.

WhatsApp +358 44 342 3867